Difference between revisions of "Presentation/Phase 6"
From S.H.O.
Line 1: | Line 1: | ||
− | {{DISPLAYTITLE:Presentation → Phase 6}} | + | {{DISPLAYTITLE:April 2016 Presentation → Phase 6}} |
[[File:Let's Build the S.H.O. Drive! - Slide 145 of 176.png|thumb|<div style="float: right">Slide 145 of 176</div>]] | [[File:Let's Build the S.H.O. Drive! - Slide 145 of 176.png|thumb|<div style="float: right">Slide 145 of 176</div>]] | ||
'''In Phase 6…'''<br>• First on the list is to get a square tote that will be used to enclose the S.H.O. Drive inside.<br>• Second is to secure plastic spools together and secure them in the center-bottom of the square tote.<br>• Third is to insert protective edge trim on the handles.<br>• Fourth is to run an enclosed extended duration test. | '''In Phase 6…'''<br>• First on the list is to get a square tote that will be used to enclose the S.H.O. Drive inside.<br>• Second is to secure plastic spools together and secure them in the center-bottom of the square tote.<br>• Third is to insert protective edge trim on the handles.<br>• Fourth is to run an enclosed extended duration test. |
Latest revision as of 10:12, 28 August 2016
In Phase 6…
• First on the list is to get a square tote that will be used to enclose the S.H.O. Drive inside.
• Second is to secure plastic spools together and secure them in the center-bottom of the square tote.
• Third is to insert protective edge trim on the handles.
• Fourth is to run an enclosed extended duration test.
Inserting the S.H.O. Drive
|
Enclosure test
|
April 2016 Presentation
I | Introduction Summary of measuring devices, back up and safety equipment, and camcorder (+accessories) |
---|
1 | Phase 1 Holes, brass hinges, square nuts |
---|
2 | Phase 2 Neodymium magnets and bearings |
---|
3 | Phase 3 Spool, coils, and ceiling hooks |
---|
4 | Phase 4 No hidden batteries, increase rigidity, hex nuts, terminal rings, toggle switch, fan blades, and extended test run |
---|
5 | Phase 5 Heavy duty basket, S.H.O. Drive insertion, secure meters, and portable extended test run |
---|
6 | Phase 6 Square tote, plastic spools, protective edge trim, and enclosed extended test run |
---|
7 | Phase 7 Prepare elevated test platform, outdoor test setup, camcorder hookup to portable power, and outdoor extended test run |
---|
Site map
HQ ● Glossary ● April 2016 Presentation
|