Difference between revisions of "Presentation/Phase 2"
From S.H.O.
(Created page with "{{DISPLAYTITLE:Presentation → Phase 2}} thumb '''In Phase 2'''<br>• First on the list is to assemble a rotor...") |
|||
Line 1: | Line 1: | ||
{{DISPLAYTITLE:Presentation → Phase 2}} | {{DISPLAYTITLE:Presentation → Phase 2}} | ||
− | [[File:Let's Build the S.H.O. Drive! - Slide 044 of 176.png|thumb]] | + | [[File:Let's Build the S.H.O. Drive! - Slide 044 of 176.png|thumb|Slide 044 of 176]] |
'''In Phase 2'''<br>• First on the list is to assemble a rotor of neodymium magnets onto the shaft.<br>• Second on the list is to insert the rotor through the bearings securely into the disassembled wooden panels.<br>• And third is to reattach the wood panels back onto the wood base blocks. | '''In Phase 2'''<br>• First on the list is to assemble a rotor of neodymium magnets onto the shaft.<br>• Second on the list is to insert the rotor through the bearings securely into the disassembled wooden panels.<br>• And third is to reattach the wood panels back onto the wood base blocks. | ||
Revision as of 15:57, 1 May 2016
In Phase 2
• First on the list is to assemble a rotor of neodymium magnets onto the shaft.
• Second on the list is to insert the rotor through the bearings securely into the disassembled wooden panels.
• And third is to reattach the wood panels back onto the wood base blocks.
Contents
[hide]Neodymium magnets
|
Assembling the magnet rotor stack
|
Inserting the rotor
|
April 2016 Presentation
I | ![]() Introduction Summary of measuring devices, back up and safety equipment, and camcorder (+accessories) |
---|
1 | ![]() Phase 1 Holes, brass hinges, square nuts |
---|
2 | ![]() Phase 2 Neodymium magnets and bearings |
---|
3 | ![]() Phase 3 Spool, coils, and ceiling hooks |
---|
4 | ![]() Phase 4 No hidden batteries, increase rigidity, hex nuts, terminal rings, toggle switch, fan blades, and extended test run |
---|
5 | ![]() Phase 5 Heavy duty basket, S.H.O. Drive insertion, secure meters, and portable extended test run |
---|
6 | ![]() Phase 6 Square tote, plastic spools, protective edge trim, and enclosed extended test run |
---|
7 | ![]() Phase 7 Prepare elevated test platform, outdoor test setup, camcorder hookup to portable power, and outdoor extended test run |
---|
Site map
HQ ● Glossary ● April 2016 Presentation
|