Difference between revisions of "Presentation/Phase 5"
From S.H.O.
(Created page with "{{DISPLAYTITLE:Presentation → Phase 5}} thumb '''In Phase 5…'''<br>• First on the list is to prepare a heav...") |
|||
(3 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
− | {{DISPLAYTITLE:Presentation → Phase 5}} | + | {{DISPLAYTITLE:April 2016 Presentation → Phase 5}} |
− | [[File:Let's Build the S.H.O. Drive! - Slide 133 of 176.png|thumb]] | + | [[File:Let's Build the S.H.O. Drive! - Slide 133 of 176.png|thumb|<div style="float: right">Slide 133 of 176</div>]] |
'''In Phase 5…'''<br>• First on the list is to prepare a heavy duty basket for holding the S.H.O. Drive.<br>• Second is to insert the S.H.O. Drive into place.<br>• Third is to secure the meters onto the basket.<br>• Fourth is to test and run the drive motor again as per procedure described in Phase 4. | '''In Phase 5…'''<br>• First on the list is to prepare a heavy duty basket for holding the S.H.O. Drive.<br>• Second is to insert the S.H.O. Drive into place.<br>• Third is to secure the meters onto the basket.<br>• Fourth is to test and run the drive motor again as per procedure described in Phase 4. | ||
Line 56: | Line 56: | ||
{{Presentation Explorer}} | {{Presentation Explorer}} | ||
{{Site map}} | {{Site map}} | ||
+ | |||
+ | [[Category:Presentation]] |
Latest revision as of 11:12, 28 August 2016
In Phase 5…
• First on the list is to prepare a heavy duty basket for holding the S.H.O. Drive.
• Second is to insert the S.H.O. Drive into place.
• Third is to secure the meters onto the basket.
• Fourth is to test and run the drive motor again as per procedure described in Phase 4.
Contents
[hide]Carrying crate
|
Inserting the S.H.O. Drive
|
Securing the meters
|
Portable test
|
April 2016 Presentation
I | ![]() Introduction Summary of measuring devices, back up and safety equipment, and camcorder (+accessories) |
---|
1 | ![]() Phase 1 Holes, brass hinges, square nuts |
---|
2 | ![]() Phase 2 Neodymium magnets and bearings |
---|
3 | ![]() Phase 3 Spool, coils, and ceiling hooks |
---|
4 | ![]() Phase 4 No hidden batteries, increase rigidity, hex nuts, terminal rings, toggle switch, fan blades, and extended test run |
---|
5 | ![]() Phase 5 Heavy duty basket, S.H.O. Drive insertion, secure meters, and portable extended test run |
---|
6 | ![]() Phase 6 Square tote, plastic spools, protective edge trim, and enclosed extended test run |
---|
7 | ![]() Phase 7 Prepare elevated test platform, outdoor test setup, camcorder hookup to portable power, and outdoor extended test run |
---|
Site map
HQ ● Glossary ● April 2016 Presentation
|